| Historic Hotel Property Specialist | |
| | |
|
The Problem:
The hotel had pinhole leaks in its copper pipes. Repair by conventional methods to known leaks was first completed.
|
|
|
|
|
|
The Problem:
They were faced with the disruptive problem of recurrent copper pinholes in their domestic hot water supply.
|
|
|
|
|
|
The Problem:
Repiping would have meant long construction time lines, massive tenant interruption, and relocation of tenants and loss of income for the owners.
|
|
|
|
|
|
The Problem:
One of the major engineering challenges facing the operators of this
world-class facility has been the damage from the effects of corrosion of the buildings piping system.
|
|
|
|
|
|
The Problem:
Unfortunately, as with many buildings of this era, the
decades of use slowly took their toll on the internal
systems in the building.
|
|
|
|
|
|
The Problem:
After more than 70 years of service, the historic Executive Pacific Plaza Hotel was rapidly deteriorating with more than 40 of their 160 rooms placed out of service due to severe pipe corrosion and low water flow.
|
|
|
|
|
|
The Problem:
Faced with the grim reality of needing to replace a deteriorating and failing piping system in the Clairemont Apartments, The property management was anxious to find an alternative.
|
|
|
|
|
|
The Problem:
Over the years, the hotel’s piping system was slowly deteriorating. Brown water, low flow, and leaks were becoming the day-to-day norm rather than the exception.
|
|
|
|
|
|
The Problem:
The problem at the GPO was a leak in a rain leader that was located in a structural column that ran 140 feet from the roof to the lower levels of the building.
|
|
|
|
|
|
The Problem:
The challenge facing the National Park Service was a failing main roof drain line and how to fix it without destroying the architectural importance of this historical building.
|
|
|
|
|