The Problem:


The facility is located in the downtown core and since it’s original construction the surrounding area had been developed, cutting off any lane or crane lifting access to the location of the condenser. This made removal and installation of a new unit cost very costly.

Santa Cruz Post Office
Santa Cruz, CA

Santa Cruz Post Office

The Problem:


The challenge facing the National Park Service, who administer the well being of the historic Santa Cruz Post Office, was a failing main roof drain line and how to fix it without destroying the architectural importance of this historical building.

The Problem:


The problem at the GPO was a leak in a rain leader that was located in a structural column that ran 140 feet from the roof to the lower levels of the building.

The Problem:


The Center contacted ACE Envirotech when they experienced an underground drain pipe failure.

The Problem:


To protect and extend the life of the 4” main water line in the Seattle Courthouse and main Administration building. The present piping system was encrusted and wrapped in asbestos.

The Problem:


The poison is lead. Lead leaching from pipes, lead solder and plumbing fixtures into the water you drink, cook, bathe in and even brush your teeth with.